CI Posture Across Repos — Slide Deck

A five-slide executive brief, CPSV-Editor & Linked Data Explorer — Software Delivery Decision, in the version re-exported on 12 September 2026. It asks for one thing: approval to start an initial clean on both applications and to stand up a standard delivery pipeline behind them, while today's acc-and-main track stays in service for rapid prototyping.

The deck is the executive-length version of what the control pages document mechanism by mechanism. Those pages say how each control works and where it does not yet hold. The deck says what the controls add up to, and what they still do not cover, which is a different question and the one a decision needs answered.

Download

CI Posture Across Repos — deck (PDF, 138 KB)

Slides are English. The deck states it was re-verified on 12 September 2026 with rulesets read from the API, thresholds from the config that declares them and mirror state from ls-remote against both remotes. This page re-checked those claims independently — see Verified against the repositories.

The posture has moved since this export — read the slides as of 12 September 2026

A batch of supply-chain work landed on all three acc branches on 19 September 2026, and more since, after this deck was exported. The slides and their descriptions below are left exactly as the PDF states them, because a transcription that drifts from its source is worse than a dated one. Five of their claims are now out of date:

  • Required checks. The slides say audit and scan are required on acc. All three acc rulesets now also require the build and deploy checks, so a red test suite blocks the merge — see Branch Protection.
  • Scope. The deck covers two applications and notes the RONL Business API runs the same five controls out of scope. Its scan is now required on acc too, so the three are aligned on that control rather than two of three.
  • What ships. Slide 4's clean-up argument predates the move to building on the runner; in both applications the tested build is now the shipped build.
  • The status footnote. Its commits, f5bae6a/be6bc54 and f7fe80f/daa4816, are the 12 September heads. The current acc heads are a7fe76f and 0143ea2, and each main carries the same tree.
  • How production deploys. In the Linked Data Explorer a push to main now starts one ordered Promote to Production workflow, which deploys the backend before the sites, rather than each deploy workflow firing on its own. See Development Workflow.

The decision the deck asks for is unaffected: the delivery pipeline below the prototyping track still does not exist.

This export counts five controls, where the last one counted four

A release-time mirror check joins the four CI controls. It is not a CI gate and cannot be: the gitlab remote lives in .git/config and no tracked file names the host, so a runner has no such remote and no route to it. It runs where the push happens, at each release, and it never pushes — it prints the command and stops. The deck carries the change as one of seven corrections on its closing slide rather than renumbering silently.


Two tracks, one of which does not exist yet

Slide 1 of 5, titled CPSV-Editor & Linked Data Explorer, subtitle both apps run on the rapid-prototyping track — acc and main, checked by GitHub Actions; standard delivery pipeline does not exist yet. A wide navy band labelled RAPID PROTOTYPING reads: fast, iterative experimentation with real CI, accept on acc, promote to main, every merge checked by GitHub Actions workflows; five controls run here — four in CI, and a fifth at each release. Below it a lighter band labelled STANDARD SOFTWARE DELIVERY — PRODUCTION-READY DEPLOYMENT with an orange TO BE BUILT tag, holding three boxes left to right: Wasstraat, a quality gate before the pipeline; CI/CD Pipeline with Build, Test and Deploy in sequence; and Production-Ready, deployment of both applications. Vertical arrows connect the bands: Initial clean — the decision, both applications are rinsed and become the first releases through the standard pipeline; Every 6 months, functionality proven on acc and main is merged into the delivery pipeline; After 2 weeks or one sprint, the deployed release becomes the new rapid-prototyping baseline

Everything ships on the prototyping track today; the delivery track below it is the thing being asked for

The framing worth carrying away is that the prototyping track is not ungoverned. Four of the five controls run there on every pull request, and the fifth runs at every release. What is missing is not CI — it is a release path that stops moving while a release is being made.


What GitHub Actions already gates

Slide 2 of 5, titled Five controls in force — with no standard software delivery aligned yet. Four cards across the top: 01 Build provenance, "Which build am I looking at?" — every environment states the exact source and build it is serving, a hand-written version number never could, confirmed by eye in production in both; 02 Action pin truth, "Is the pin telling the truth?" — standard tooling only checks that a build step is pinned to a fingerprint, and the pin is re-resolved against source because a wrong or hostile pin passes every review; 03 Code and dependency scan, "Is anything known-vulnerable shipping?" — the other half of the supply chain, the package tree and our own code, scanned on every merge, with the CPSV Editor at zero findings and the Explorer at four; 04 Test-coverage floor, "Is this code actually tested?" — 80% of decision paths tested in every file, so a well-tested utility can no longer pay for an untested screen, standard tooling in both and no exemptions left. Below them three panels: IN PLACE — CI GATING, the audit and the scan are required checks on acc in both and on main in the Explorer, and the test suites stop the deploy when they fail; 05 — MIRROR CHECK, NOT A CI GATE, both apps are mirrored to a second host no runner can reach, checked at every release instead, the one control that cannot run in CI; and MISSING — DELIVERY PIPELINE, both branches stay inside prototyping with no production-ready deployment beyond them. A table headed GATED IN CI TODAY compares the CPSV Editor and the Linked Data Explorer: all five controls in place, Yes and Yes; required checks on acc, audit and scan in both; required checks on main, None — decided, issue 131, for the Editor and audit and scan for the Explorer; tests run before a merge, Yes and Yes; formatting checked in CI, Yes and Yes; production build id confirmed by eye, Yes — 9 Sep in both; scan findings at the last run, 0 for the Editor and 4, one real and tracked, for the Explorer; mirror in sync at the last check, Yes on both branches in both

The five controls as questions, and exactly where each repository requires them

Each control has a page here, and the page is where to go when the answer needs to be more precise than Yes:

Deck control The question it answers Documented in
01 — Build provenance Which build is this environment serving? Build Provenance
02 — Action pin truth Is the pinned digest the version its comment claims? Supply-Chain Pinning — check-supply-chain
03 — Code and dependency scan Is a known-vulnerable package or pattern shipping? Supply-Chain Pinning — the npm tree
04 — Test-coverage floor Is every file tested, not just the package average? Coverage Floor
05 — Mirror check Does the second copy still match the one the gates run on? Supply-Chain Pinning — the GitLab mirror

The controls index carries the same five rows across all three applications.

The Yes/Yes table is scoped to two applications, and that scoping matters

The deck covers the CPSV Editor and the Linked Data Explorer, which is where the decision applies. Two qualifications belong with it:

  • The RONL Business API now runs the same five controls, as of 12 September 2026, and the deck says so on its closing slide while keeping it out of scope for the decision. It differed in one respect when the deck was exported: its scan ran on every pull request but was deliberately not a required check while its first scan's 435 findings were triaged. Since 19 September it is required on acc, alongside audit and the build and deploy checks; its main still requires audit alone. See the controls index.
  • The Norm Editor is shaped differently again — GitLab CI, its own hook directory, and none of these controls. See Code Standards.

Reading the table as "all applications, all green" is the one misreading this page exists to prevent.


Eight items, all closed

Slide 3 of 5, titled Eight items, all closed: every item raised in the CI posture review is closed in both repositories, acc and main are in sync, and two further controls landed in the same period; nothing on the prototyping track is holding this decision up. A highlighted box reads "The prototyping track is finished work, not work in progress — the remaining gap is the graded release path above it, the thing you are asked to approve." Eight ticked rows, each tagged with the repository it belongs to: Last coverage exemption cleared, CPSV, issue 103 — the largest file went from 45.7% to 98.3% branch coverage, the last exemption went with it and the bespoke script is retired; Pin register kept in step with the bumps, both — bumps now update the pins and the register recording them on the same branch, a mechanism rather than a habit; Zero margin on the coverage floor, Explorer — twelve files raised without touching production code, package average 92.9%, one file remains under 85%; Formatting checked on the shared branch, CPSV — checked in CI rather than only by a hook on a developer's machine; Production build ids confirmed once, both — read off the running application, because the failure mode is a successful-looking deploy of the wrong thing; Code and dependency scanning made blocking, both, new — required on acc in both and on main in the Explorer, which went from 76 findings to 4 in a day; The dependency tree itself now refreshed, both, new — the bot only updated what we name directly while everything underneath sat still, and the Editor's last seven findings went to zero on the first refresh; The second copy is checked at each release, both, new — a release-time check now distinguishes behind from diverged, the first being one command and the second surgery

A delivery report rather than a backlog — the eight items, and where each landed

All eight are recorded here in their own right:

Deck item Where it is documented
Last coverage exemption cleared Coverage Floor — why one repository needed a script first
Pin register kept in step with the bumps Supply-Chain Pinning — the habit the register depends on
Zero margin on the coverage floor Coverage Floor — raising coverage without writing hollow tests
Formatting checked on the shared branch Code Standards
Production build ids confirmed once Build Provenance
Code and dependency scanning made blocking Supply-Chain Pinning — the npm tree
The dependency tree itself now refreshed Supply-Chain Pinning — Renovate maintains dependencies, not the tree
The second copy is checked at each release Supply-Chain Pinning — the GitLab mirror

The last two are the ones that were not on the original review list: the dependency refresh and the mirror check both came out of the work the review triggered, which is the usual shape of an honest delivery report.


The ask

Slide 4 of 5, headed ASK — Start the initial clean: rinse the CPSV-Editor and the Linked Data Explorer, and stand up the standard delivery pipeline behind them — a Wasstraat quality gate, then build, test and deploy to a production-ready release; today's acc-and-main track, with its five controls, stays in service for rapid prototyping. Three columns. What it buys: a delivery path separate from experimentation, so a release stops moving every time someone tries something; the five controls become gates on a deployment, not only on a merge between prototyping branches; a quality gate, the Wasstraat, that nothing reaches users without passing. What it costs: building the delivery pipeline and the Wasstraat gate, a one-off engineering investment; one clean-up pass on each application before it can be the first pipeline release; prototype work then reaches a deployment on a six-month merge, not the day it is written. What it delivers: production-ready, graded applications deployed through a pipeline rather than promoted between prototyping branches; the five controls stop being the last word and become the entry condition for a release; rapid prototyping keeps its speed on acc and main, staying the track where things are tried rather than the track that ships. A footnote reads: re-verified 12 September 2026 — main at f5bae6a and be6bc54 for v2026.09.4, acc at f7fe80f and daa4816; rulesets read from the API, thresholds from the config that declares them, mirror state from both remotes — not written from memory

What it buys, what it costs, what it delivers — the cost column is the honest one

The trade the middle column names is the substance of the decision: prototype work would reach a deployment on a six-month merge rather than the day it is written. Speed on the prototyping track is preserved precisely by not letting that track be the thing that ships.

The middle row of What it buys reads more sharply next to slide 2's table: the five controls becoming gates on a deployment is precisely what the CPSV Editor's main does not have today, by decision — and the delivery pipeline is where that decision would be revisited.


What changed between deck versions

Slide 5 of 5, titled What changed in this version — seven changes since the last version, so nothing in the earlier framing is carried forward silently. A three-column table of topic, previous version and this version: Number of controls, from four — build provenance, pin truth, scanning, coverage floor — to five, plus a release-time mirror check, the one control that cannot run in CI at all; Delivered items, from six all closed to eight all closed, lock-file maintenance and the mirror check joining them; Scan findings, from the Explorer 76 down to 4 with the Editor's last seven put down to needing an upstream release, to that was wrong — nothing had ever refreshed the transitive tree, and enabling it took the Editor to zero; The mirror, from not mentioned, outside every gate and unwatched, to checked at each release in both and in sync on both branches as of 12 September; Where the controls are required, from "acc or main" in both to acc in both and main in the Explorer only, the CPSV Editor's main ungated by decision, issue 131; Status verification, from the main branch of both with no commits named, to re-verified 12 September 2026 with main at f5bae6a and be6bc54 and acc at f7fe80f and daa4816; Scope, from two applications to still two — a third, the RONL Business API, now runs the same five controls but is out of scope here

The deck carries its own corrections rather than quietly replacing the earlier framing

Two rows are worth reading closely, because both are cases of a claim being revised downward in confidence rather than upward in scope.

Scan findings. The previous version reported the CPSV Editor's last seven findings as waiting on an upstream release. That was wrong, and the deck says so in those words: nothing had ever refreshed the transitive tree, because Renovate maintains declared dependencies and not what they resolve to. One refresh took the scan to zero. The earlier explanation was plausible, was believed, and would have justified doing nothing indefinitely.

The mirror. The previous version did not mention it. The narrower true statement is that the release check closes the observation half of the problem, not the drift: the mirror is still pushed by hand, it still falls behind on every merge, and what changed is that a release now notices.


Verified against the repositories

The deck's status claims were re-checked on 12 September 2026 rather than taken on trust, and re-read against the current acc heads on 27 September 2026:

  • The rulesets were read from the API, per branch, with gh api repos/<owner>/<repo>/rules/branches/<branch>, which reports the effective rules from every ruleset at once rather than one ruleset in isolation. As they stand today:

    acc main
    CPSV Editor pull request, audit, scan, Build and deploy ACC no ruleset rules — a pull request only, by decision (#131)
    Linked Data Explorer pull request, audit, scan, deploy, Build and Deploy Frontend, Build and Deploy ROPA Site, deletion, non-fast-forward pull request, audit, scan, deletion, non-fast-forward
    RONL Business API pull request, audit, scan, build, Build and Deploy ACC Frontend, Build and Deploy ACC PA Demo, Build and Deploy ACC Public Site, deletion, non-fast-forward pull request, audit, deletion, non-fast-forward

    On 12 September, when the deck was exported, the acc rows read audit + scan for the first two and audit alone for the third, and each main mirrored its acc. The build checks and the RONL Business API's scan were added on 19 September, to acc only.

  • The pin counts were re-derived by counting uses: references on each acc head rather than read from a register: the CPSV Editor 17 of 17 across seven workflows, the Linked Data Explorer 31 of 31 across eleven, the RONL Business API 39 of 39 across thirteen. All are fully digest-pinned. The counts are action references: each promotion workflow also calls the production deploys as local reusable workflows, three in the Linked Data Explorer and four in the RONL Business API, which name a path in the same repository rather than a version and have nothing to pin. The CPSV Editor's references sat across four workflows when the deck was exported; v2026.09.6 moved its two preview-closing steps into a workflow of their own, and v2026.09.7 added the daily dependency audit and the release SBOM.

  • acc and main carry the same code in both applications the deck covers — as they did on 12 September, when the deck's footnote named the promotion commits f5bae6a and be6bc54. On 27 September they are 7d154ba (the CPSV Editor) and 4148c9a (the Linked Data Explorer), each the same tree as its acc head.
  • Production has run in both: at the deck's export, the CPSV Editor's Deploy PROD at f5bae6a as run 94 and the Linked Data Explorer's Deploy Frontend to Production at be6bc54 as run 44; on 27 September, Deploy PROD #102 at 7d154ba, and the Linked Data Explorer's Promote to Production #2 at 4148c9a — which since v2026.09.7 is the one workflow a push to its main deploys through. The deck's "confirmed by eye — 9 Sep" refers to the first builds, #88 and #39.

One claim on slide 2 is not verifiable from here and is reported as the deck states it: the scan-findings figures, 0 and 4, are the last run's results in the Semgrep dashboard, which this documentation cannot read.